1.mold production cycle, refers to accept orders from mould date, until the mold test qualification after delivery the client in time. Obviously the production cycle is one of the symbol of an enterprise production capacity and technical level. The increasingly fierce competition in the market today, the injection mold used unit requirements as soon as possible to get the mold required, as soon as possible to bring products to market. Thus, reflect the production cycle length is also a mold enterprise benefit. 2.factors affecting the mold production cycle. Theoretically, we all hope that the production cycle as short as possible. However, this is not want to shorten the growth cycle length was shortened, related to many factors, mainly in the following points. Design and technical personnel. After receiving injection task, first by the technical staff to carry out mold design, this is a very high level of technology work. The same plastic parts, can be obtained by using a variety of methods, the most simple, what methods the best quality, the highest efficiency, complete technical staff in hand, its level is high, the quality of plastic parts, mold manufacturing, production cycle play a decisive role role. Can save the design space, to shorten the production cycle. To find a good solution, will play a multiplier effect; the degree of specialization of mould enterprises. Saying goes: Skill comes. More familiar things, the more you do it fast, do good. Mold is the same, if a business has long been engaged in mold production, that he is not produced die enterprises to more quickly; and long engaged in a mold, such as injection molding production enterprises in the production of injection mold, he is also very proficient. Die of their most familiar production only the mold enterprises, to shorten the production period of the mold. 3.The degree of modernization of production technology of mould. Saying goes: to do his work well, must first sharpen his tools! With advanced equipment, why the efficiency is not high, the quality is not good! In the injection mold design, manufacturing process, equipment factors play a large role, only the introduction of advanced technology, such as the mold CAD/CAM technology, high speed cutting equipment, powerful high-speed grinding machine, high precision CNC machine tools, CNC profile milling machine, digital control optics curve grinding machine, high precision NC WEDM, CNC profile milling machine, CNC optical curve grinding machine, high precision NC wire cut EDM machine and so on, with these modern methods, but also have to worry not shorten the production cycle! 4.the management level of enterprises. A set of mould is not big, but it moved into the e.terprise liaison in all aspects, any link problems, will extend the production cycle, and these links coordination and organization, is an important aspect of a measure of the level of enterprise management. Therefore, the use of advanced management methods and systems to manage the enterprise, can greatly shorten the production cycle. 5.The degree of standardization of die technology. Mold standardization level is one of the symbol of measuring a country mold technology and production development level, standardization has certain basic mold technology in our country, but as a whole is not enough, mold standard parts of the degree of commercialization is poor, a lot of standard parts, GM parts, such as the template, a mold base, a guide column, the guide sleeve are difficult to find, thereby lengthening the mold production cycle. |