HotSearch: Precision mould| parts| plastic| Auto parts| Digital electronics| Precision machining
 
TEL: 0086-769-81889851
FAX: 0086-769-85645909
Linkman: Mr.Xia
Modile: 13712146592
Linkman: Mr.Cheng(En,Jp)
Modile: 13925299144
Zip: 523860
Add: No.1, Xi er Street, Wushaliwuxingfa South Road, Chang an Town, Dongguan, Guangdong, China
Mr.Cheng 13925299144(English,Japanese)
 Current Location:Home - News - Trade News
 
what must be done before assembly
 
Time:2013.11.08 News Sources:Dongguan Zhongyu precise Mold Co., Limited Views:
 
 
Pre: How to carry out the injection molding BMC
Next: Why die will rust, how to avoid corrosion
 
Home |  About Us |  News |  Products |  Industries |  Equipments |  QC System |  Partners |  Job |  Contact | 
   
Dongguan Zhongyu Precise Mold Co., Ltd  
ADD:No.1, Xi er Street, Wushaliwuxingfa South Road, Chang an Town, Dongguan, Guangdong, China
Tel:0086-769-81889851  Fax:0086-769-85645909  E-mail:dgzy136@zhongyumoju.com dgzy159@zhongyumoju.com