Mold in the installed after a good, need to safely, reliably installed in the injection molding machine, general procedures are as follows. First, the preparation before installation 1.removal of template and mold with all the dust and dirt on the surface of the fixed template, choose good fastener. 2.Injection molding machine mold will be installed and used for inspection, verification, confirmation. 3.Standard will be installed for clamping, measuring, work, clearly don't like, put on the table a conspicuous place. Two, the installation 1.of check melt into assembly position feed inlet bushing with the template positioning hole and the positioning ring is correct. Clamping positioning 2.check the guide column and a guide sleeve is correct, sliding fit status should be lively freely. 3.low pressure, slow closing, and carefully observed the various parts work correctly. 4.The clamping mold plate, fixed by the pressing plate, the distribution should be uniform distribution should be reasonable, bolts, nuts and tighten to the diagonal compression, and gradually increase the tightening force. 5.slow mode, adjust the ejector rod position, pay attention to the ejector rod fixed plate and the movable die plate, should gap 5mm. 6.calculation template fixed stroke stroke, slide control switch, adjust the active template distance. 7.The test, a good school ejector rod position, and adjust the clamping device limit switch. 8.Size to adjust the clamping force, first from low value, to mold movement for connecting rod stretching easily prevail. |